CMMC Takes Effect Today: A Maryland Subcontractor’s 90-Day Plan

The CMMC program rule takes effect December 16, 2024. A 90-day plan for Maryland defense subcontractors covering scope, SPRS scores, POA&Ms and primes.

A security consultant traces a printed part drawing taped to a CNC machine while the shop owner points to the shop-floor computer

A prime contractor emails a cybersecurity questionnaire just as your team is finishing a delivery. It asks for your CMMC level and SPRS score. You’ve bought security software, but can you explain which systems the answers cover?

Today, December 16, 2024, the Cybersecurity Maturity Model Certification program rule takes effect. The Department of Defense’s final rule (2024), 32 CFR Part 170, states: “This rule is effective December 16, 2024.” Your next 90 days should turn uncertain answers into evidence you can defend.

Tailored Management Consulting, LLC (TMC), a Columbia, Maryland consulting firm, provides cybersecurity services, security risk management and project management. Those disciplines meet here: an IT lead can configure a safeguard, but someone must also define its scope, assign responsibility and connect the work to subcontract commitments.

What changes today—and what doesn’t?

The effective date can sound like an immediate certification deadline for every defense supplier. It isn’t. Treating it that way could send you shopping for an assessment before you know what needs assessment.

The program rule establishes assessment and status requirements. Under section 170.3(e), Phase 1 begins on the effective date of the complementary acquisition final rule, not today’s program-rule date. The DoD acquisition proposal (2024), published August 15, proposes the corresponding contract changes; that rulemaking remains unfinished as of today.

But existing safeguarding and assessment obligations haven’t disappeared. Your current subcontract clauses still matter. A prime may also set a readiness milestone through its purchasing terms. Those are separate questions from the government’s phased CMMC rollout.

A useful starting document is a contract-to-system register. For each subcontract, you can record the safeguarding clauses, information involved, systems used and the prime’s requested assessment type. You’ll also want proposed future requirements marked separately from present obligations. This prevents a questionnaire deadline from being mistaken for a universal federal deadline—and makes unresolved questions visible before you spend money.

Days 1–15: identify the information before choosing a level

“Everything is confidential” doesn’t tell your IT team what to protect under which rule. Say a 40-person engineering subcontractor in Hagerstown produces test fixtures. A nonpublic delivery schedule and a government-provided technical drawing may need different treatment, even if both arrive in the same mailbox.

Federal Contract Information (FCI) is nonpublic information provided by or generated for the government under a contract to deliver a product or service. Public information and simple payment-processing information are excluded. FAR 52.204-21 (2021), paragraph (b)(1), specifies 15 basic safeguards. For FCI-only work, you’re preparing against those safeguards through CMMC Level 1, rather than assuming you need a CUI assessment.

Controlled Unclassified Information (CUI) requires safeguarding or dissemination controls based on law, regulation or governmentwide policy. A sensitive-looking file isn’t automatically CUI. For uncertain drawings or specifications, your program manager should request written clarification from the prime about the information category and contractual handling instructions. Missing markings shouldn’t become your sole reason for treating a file as unrestricted.

For CUI work, Level 2 is the minimum CMMC level; the required assessment type also matters. Under section 170.23, CUI flowing from a prime contract requiring Level 2 certification requires at least Level 2 certification downstream. You can’t choose self-assessment just because your company is small.

Your first deliverable can be a short information register: representative file types, their contract source, approved recipients and permitted storage locations. It gives scoping a factual starting point. Without it, the security team may protect the wrong boundary.

Days 16–30: scope the workflow, including its inconvenient copies

The obvious engineering server may be only part of your CUI environment. In our hypothetical Hagerstown shop, an engineer downloads a drawing, prints it beside a test bench and sends a diagnostic attachment to an outside IT provider. A diagram showing just the server misses the work.

You can test your proposed boundary by tracing a representative file from receipt through disposal. That review can cover email, endpoints, shared storage, backups and paper copies. You’ll learn more if staff demonstrate the process; a policy describing where files should go won’t reveal every place they actually go.

The DoD final rule (2024), section 170.19(c), distinguishes five Level 2 asset categories:

  • CUI Assets process, store or transmit CUI and are assessed against all Level 2 requirements.
  • Security Protection Assets provide security functions for the assessed environment. Relevant requirements apply even if these assets don’t hold CUI.
  • Contractor Risk Managed Assets can handle CUI but aren’t intended to, because documented policies, procedures and practices prevent that use. They remain in scope, with specific review provisions.
  • Specialized Assets, such as qualifying test equipment that can handle CUI but can’t be fully secured, require inventory and system-security-plan documentation and risk-based management.
  • Out-of-Scope Assets can’t handle CUI, provide no security protection for CUI assets and meet the rule’s separation criteria. You must be able to justify their exclusion.

A restricted CUI enclave—a separated working environment—may reduce assessment effort. It also creates operating costs because users need approved transfer paths and separate access, and must give up some convenient sharing options. It won’t help if engineers keep downloading drawings to ordinary laptops.

Your asset inventory, network diagram and system security plan should describe the same boundary. For an outside IT provider, a customer responsibility matrix can show who performs each security task and who supplies evidence. A cloud offering handling CUI must meet the applicable FedRAMP Moderate-or-higher authorization or equivalency requirements. A subscription name doesn’t establish that.

By day 30, the owner should approve both the boundary and the workflow restrictions needed to keep it true. That decision reduces scope without hiding systems that belong inside it.

Days 31–50: assess what works, not what the policy promises

A policy can say that former employees lose access promptly while an old account remains active. This is why a document-only checklist can produce confidence the system hasn’t earned.

For CMMC Level 2, today’s final rule specifies the 110 requirements in NIST SP 800-171 Revision 2, including its January 2021 updates. It incorporates the June 2018 assessment publication. A newer NIST publication doesn’t automatically replace the version named in the CMMC rule. Your assessment workbook should identify its revision before anyone starts scoring.

NIST SP 800-171A (2018) describes examination, interviews and testing as assessment methods. For access control, that could mean examining approved account lists, asking the administrator how departures are handled and testing whether a disabled account can still connect.

Your system security plan (SSP) should explain the boundary and how each requirement is implemented. It isn’t a purchased policy binder. The rule doesn’t permit completing a Level 2 assessment without an up-to-date SSP.

A practical evidence register pairs each assessment objective with an owner, the supporting artifact and the assessment result. For CMMC, a requirement is MET only when all applicable objectives are satisfied by evidence; drafts and unapproved policies aren’t acceptable substitutes for final evidence.

If you handle FCI only, this phase follows the Level 1 requirements instead. The rule provides for annual Level 1 self-assessment and affirmation, and all applicable safeguards must be MET. There’s no Level 1 conditional status supported by a remediation list.

Evidence makes the work transferable. If your administrator leaves, the next person shouldn’t have to reconstruct why the company claimed a requirement was met.

Days 51–60: make the SPRS score traceable to the assessed system

“We have a score” leaves too much unsaid. The number may cover an old network, omit a facility or describe a different assessment process from the one the prime requested.

The Supplier Performance Risk System (SPRS) holds assessment information. The DoD Assessment Methodology, Version 1.2.1 (2020), starts a Basic Assessment at 110 and deducts weighted values for unmet requirements, generally 1, 3 or 5 points. Scores can be negative. A planned fix doesn’t earn points for an unimplemented requirement.

For illustration, two unmet five-point requirements, one three-point requirement and two one-point requirements produce 110 − (2 × 5 + 3 + 2 × 1) = 95. That’s a weighted assessment result, not a percentage of requirements implemented.

DFARS 252.204-7020 (2023), paragraphs (d) and (g), specifies summary information and subcontract assessment obligations. For applicable systems, the Basic Assessment record includes the standard version, assessment date, associated Commercial and Government Entity (CAGE) codes, summary score and expected date for full implementation. Current assessments generally can’t be more than three years old; a solicitation can specify a shorter period.

You can reconcile the SPRS submission against the SSP and scoring workbook before posting or updating it. You’ll want confirmation of what was submitted. A Basic Assessment score is not a CMMC certification. Nor does a historic Basic Assessment entry, by itself, establish Level 2 (Self) CMMC status: the CMMC process includes its own scope, evidence, reporting and affirmation requirements.

Days 61–80: separate the repair backlog from conditional-status eligibility

A plan of action and milestones (POA&M) can look like permission to postpone any difficult safeguard. It isn’t. A company could have a respectable score and still fail the conditions for Conditional Level 2 status because one prohibited gap remains.

Under the DoD final rule (2024), section 170.21, the minimum score ratio is 0.8: 110 × 0.8 = 88 points. That threshold alone is insufficient. Generally, an eligible POA&M item can’t have a value greater than one point. The specified exception allows requirement 3.13.11 when encryption is employed but isn’t FIPS-validated, resulting in a three-point deduction.

Six requirements can’t appear on a conditional-status POA&M: external connections (3.1.20), public information control (3.1.22), the SSP (3.12.4), visitor escorting (3.10.3), physical access logs (3.10.4) and physical access devices (3.10.5). Level 1 permits no assessment POA&M.

For Conditional Level 2, eligible gaps must be corrected and confirmed through a closeout assessment within 180 days of the Conditional CMMC Status Date. That clock doesn’t start today merely because the program rule takes effect. A self-assessment path uses self-assessment closeout; a certification path requires closeout by an authorized or accredited CMMC Third-Party Assessment Organization (C3PAO).

Your working remediation register should therefore have a separate field for conditional-status eligibility. It can track every gap, including ones that must be fixed before an assessment can yield conditional status. The register doesn’t itself confer permission to continue performance with unmet contractual requirements.

You’ll want each item to have an accountable owner, approved resources, a completion milestone and the evidence required for closure. This makes a promise testable. Purchasing software closes a purchase order; demonstrating the requirement closes the security gap.

Days 81–90: agree with the prime on what your answer means

A prime may ask for “CMMC compliance” without identifying the assessment type or information boundary. If you answer yes to that shorthand, procurement may interpret more than you intended.

A useful readiness conversation starts with written questions:

  • Which FCI or CUI will this subcontract require us to handle, including information we generate?
  • Which safeguarding clauses and assessment requirements apply now?
  • What CMMC level and assessment type are anticipated, and what contract language supports them?
  • What readiness evidence does the prime expect, through which protected channel, and by what date?

Your own suppliers need clear instructions. FAR 52.204-21 requires its substance to flow to applicable FCI subcontracts. The existing DFARS safeguarding and assessment clauses have their own flow-down provisions. Under applicable DFARS 7020 terms, an award for work subject to NIST SP 800-171 implementation can’t proceed without the required current assessment for relevant systems.

For CMMC planning, section 170.23 links downstream requirements to the information handled and the prime’s assessment requirement. An FCI-only supplier doesn’t automatically inherit the prime’s CUI assessment level. Conversely, a CUI supplier can’t substitute a self-assessment where the required flow-down calls for certification.

Your prime-facing statement can identify the assessed scope, assessment type, score date and unresolved work without casually emailing your full SSP. You’ll avoid unnecessary disclosure if evidence access and protection are agreed first. This helps procurement evaluate your readiness without distributing system details beyond those who need them.

Your day-90 answer should survive an employee’s absence

The owner’s final review shouldn’t depend on the IT lead being available to explain every spreadsheet. You need a repeatable answer to the next questionnaire.

A sensible day-90 package contains the contract-to-system register, approved scope, current SSP, evidence-backed assessment and applicable SPRS submission confirmation. It also includes funded remediation work and the prime’s written expectations. Where CMMC applies, the rule requires senior-level affirmation after assessments and annually thereafter, so the person responsible for that affirmation needs access to the evidence—not just the score.

If you need help connecting security work to accountable delivery, TMC’s free consultation is a place to discuss the boundary and project responsibilities.

The next time someone forwards a drawing to a different mailbox, your team should know whether that action changes the approved scope. That operational answer is more useful than a compliance label nobody can explain.